Skip to content
OCRV Center logo
Topic

Before and After Repair Stories

Short answer. Real jobs from intake through delivery, including what the teardown found and how the supplement was handled.

  1. 01

    School Bus Skirt and Wheel Well Rust: A Full Rebuild

    A district activity bus came in with perforated skirt panels and rusted wheel wells. Here is the cut back, the structural findings, the panel fabrication and the finish.

    8 min read

  2. 02

    Dock Strike: Rebuilding a Box Truck Rear Post and Header

    A twenty six foot box truck backed into a dock bumper at an angle and folded its rear corner post. Here is the teardown, the structural repair and the return to service.

    8 min read

  3. 03

    A West Covina Travel Trailer Sidewall, Relaminated

    A twenty eight foot travel trailer arrived with a bubbled street side wall. Here is the tap map, the moisture readings, the supplement fight and the panel rebuild.

    9 min read

  4. 04

    Parking Structure Hit: Sprinter Slider and Quarter Panel Rebuild

    A Sprinter conversion caught a parking structure column and jammed its sliding door. Here is the teardown, the track and rail findings, the supplement and the rebuild.

    8 min read

  5. 05

    Pin Box and Front Cap Rebuild After a Fifth Wheel Jackknife

    A fifth wheel jackknifed into the tow vehicle and crushed its front cap and pin box area. Here is the teardown, the frame check, the supplement and the eight week rebuild.

    8 min read

  6. 06

    Low Bridge, Class A Front Cap: A Rebuild From Intake to Delivery

    A Class A diesel pusher clipped a low clearance structure and lost the top of its front cap. Here is the intake, the teardown findings, the supplement and the rebuild sequence.

    8 min read

Ready to get a written estimate

We write estimates at the shop and bill your carrier direct. 30 to 45 minutes from West Covina on the 57 and the 91.

Call NowRequest a Quote